Week 1
Work on drafts for all products including the front cover,
feature article and contents page, include detail on where to put things, what
font using and what colours may work out best.
Week 2
Take photos of two models in the studio, including head
(profile) shots and a backstage shot as well as other different angles, also
take pictures of third model for front cover and feature article at Belton,
River Waveney.
Week 3
Set out the basic outline including the background image,
colours fonts and masthead for the front cover, also work on placing (where the
cover lines are going to go)
Week 4
Put the cover lines and main cover lines and finalise spacing,
fonts, colours, barcode and pricing for the front cover.
Week 5
Set out the basic outline for the content page (where each
of the sections are going to go (pictures, features, regulars, win)), included
masthead, issue number and section on where else to access the magazine.
Week 6
Put in page numbers, headlines and kickers, finalize the
layout, colours and fonts.
Week 7
Set out the basic outline of the feature article including
the background, main image, pull quote, masthead, title, footer, page numbers, and
sidebar. Start writing the interview for the feature article.
Week 8
Finish writing the interview for the feature article, then finalise
the layout, fonts, colours and placing of images, pull quote and side bar.
Week 9 and 10
Make finishing
touches to all products after gaining feedback.
|
|
Week 1
|
Week 2
|
Week 3
|
Week 4
|
Week 5
|
Week 6
|
Week 7
|
Week 8
|
Week 9
|
Week 10
|
||||||||||||||||||||
|
Lesson
|
1
|
2
|
3
|
1
|
2
|
3
|
1
|
2
|
3
|
1
|
2
|
3
|
1
|
2
|
3
|
1
|
2
|
3
|
1
|
2
|
3
|
1
|
2
|
3
|
1
|
2
|
3
|
1
|
2
|
3
|
|
Product Drafts
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Photo Shoots
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Construct Font Cover
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Construct Contents Page
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Construct Feature Article
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Finalize all products
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|